Difference between revisions of "Qualitative Screening (Task 4)"
(→Scope) |
|||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
==Task Overview== | ==Task Overview== | ||
===Background=== | ===Background=== | ||
− | This task identifies fire | + | This task identifies fire compartments that can be shown to have little or no risk significance without quantitative analysis. Fire compartments may be screened out if they contain no components or cables identified in Tasks 2 and 3, and if they cannot lead to a plant trip due to either plant procedures, an automatic trip signal, or technical specification requirements. |
===Purpose=== | ===Purpose=== | ||
− | This procedure describes the criteria for qualitatively screening | + | This procedure describes the criteria for qualitatively screening fire compartments defined in Task 1. |
===Scope=== | ===Scope=== | ||
− | This | + | This task addresses the following issues in qualitative screening: |
* Definition of screening criteria and basis, including definition of plant trip initiator and controlled manual shutdown; | * Definition of screening criteria and basis, including definition of plant trip initiator and controlled manual shutdown; | ||
* Reference to Fire PRA component list used in qualitative screening and criteria for equipment selection; and | * Reference to Fire PRA component list used in qualitative screening and criteria for equipment selection; and | ||
− | In most fire IPEEE analyses, the primary containment was qualitatively screened. In this methodology description, the examination of potential risk associated with fires in primary containment will follow steps similar to other locations of the plant. | + | In most fire Individual Plant Examination of External Events (IPEEE) analyses, the primary containment was qualitatively screened. In this methodology description, the examination of potential risk associated with fires in primary containment will follow steps similar to other locations of the plant. |
− | ==Related Element | + | ==Related Element of ASME/ANS PRA Standard== |
Qualitative Screening (QLS) | Qualitative Screening (QLS) | ||
Line 21: | Line 21: | ||
==Supplemental Guidance== | ==Supplemental Guidance== | ||
− | + | There is no supplemental guidance associated with Qualitative Screening (Task 4). |
Latest revision as of 15:16, 10 December 2018
Contents
Task Overview
Background
This task identifies fire compartments that can be shown to have little or no risk significance without quantitative analysis. Fire compartments may be screened out if they contain no components or cables identified in Tasks 2 and 3, and if they cannot lead to a plant trip due to either plant procedures, an automatic trip signal, or technical specification requirements.
Purpose
This procedure describes the criteria for qualitatively screening fire compartments defined in Task 1.
Scope
This task addresses the following issues in qualitative screening:
- Definition of screening criteria and basis, including definition of plant trip initiator and controlled manual shutdown;
- Reference to Fire PRA component list used in qualitative screening and criteria for equipment selection; and
In most fire Individual Plant Examination of External Events (IPEEE) analyses, the primary containment was qualitatively screened. In this methodology description, the examination of potential risk associated with fires in primary containment will follow steps similar to other locations of the plant.
Related Element of ASME/ANS PRA Standard
Qualitative Screening (QLS)
Related EPRI 1011989 NUREG/CR-6850 Appendices
None
Supplemental Guidance
There is no supplemental guidance associated with Qualitative Screening (Task 4).